Dry rot was discovered in the old front door frame. We had to remove the door and frame and the skirtings and plaster in the internal hallway. The masonry was treated with a dry rot treatment. We then re-plastered and fitted new skirtings and decorated. We manufactured a new bespoke hardwood door and frame to match the original doors in the street, fitted them along with upgraded security and decorations.